Projects Thunderbolts Way Slope Stabilisation

  • Client: Mid Coast Council
  • Duration: 3 Weeks
  • Location: Northern Tablelands Region, NSW
View all projects

Project Overview

This slope had recently been cleared by Council which exposed the loose boulders and conglomerate material which was deemed susceptible to possible landslides during poor weather. It was agreed that a slope stabilisation solution was required. At this point, Warner Company were engaged to undertake the works which involved a self-drilling anchor system which were 4m long. The anchors were fully grouted galvanised hollow bars. Upon completion of the anchor installation, Maccaferri MacMat R was installed onto the slope surface to hold the loose material in place and encourage growth to stabilise the face.